Your typical bathroom remodel timeline can range from roughly three weeks to up to three months. The size of your bathroom, design complexity, permits, and underlying damage are key factors affecting when your new bathroom will be ready.
Bathroom remodeling is a common project for homeowners to invest in due to its frequent daily use and ability to become a comforting haven. According to Statista, 47% of people take on this project due to the hate they have for the old bathroom style, whereas 35% do so because of bathroom deterioration.
Whether you want to upgrade the style or repair deterioration, your Tampa Bay renovation professionals can provide insight about how long it may take to create the bathroom of your dreams.
How Long Is a Typical Bathroom Remodel Timeline?
When it comes to renovation planning for your bathroom, it can take from a few weeks to several months. A basic room, like a half bathroom or powder room, averages a three-week renovation. That timeline goes up to about 4- 6 weeks for a small full bathroom.
Expect two to three months for a custom master bath upgrade. What if there’s more extensive work related to upgrading plumbing? It can take 10 to 14 weeks for a major gut renovation.
What Are the Main Steps in Bathroom Renovation?
The bathroom renovation timeline begins with the planning and design phase with your Tampa Bay home remodeling contractor, which may take up to three weeks. Work with your renovator to finalize your overall vision, such as features you wish to add and take out, discuss materials and finishes, and review different color swatches.
It may take a couple of days for demolition as your professional renovators must tear out old materials. During this time, they may discover things that need to be repaired, like hidden water damage.
Renovators will also have to take a week or two to do what’s called rough-in or behind-the-walls work. This includes adding structural adjustments, HVAC systems, electrical upgrades, new plumbing, etc.
Depending on your location, additional inspections may be needed before renovators can move on to the next step.
Now it’s time for the installation phase, which may take 2 to 4 weeks. Your professional contractors can close up anything that’s open and install new materials like cabinets and tiles. You’ll start to see your fixtures coming together as your dream bathroom takes shape.
Once everything is in place, it may take a day or two for final touches like cleaning up the area and doing final sealing.
What Factors Affect the Bathroom Makeover Timeline?
Your remodeling timeline depends on the scope of work, materials, and whether you’re attempting a DIY project or using professional renovators. Plus, discovering and repairing underlying issues can back up a project.
Scope of Work
According to a nationwide survey by Houzz, some bathroom innovation trends include adding bidets to their toilets, increasing shower sizes, and replacing vanities. At least 72% of Florida homeowners choose double sinks during renovation.
Repairs
You don’t want to put new flooring or a tub over bad plumbing and mold. If water damage due to mold continues to spread, it will further cause your foundation to weaken, resulting in more repairs later on.
Pro or DIY Work
Handy people may be tempted to do their own bathroom, but the time for that will draw your project further out. Plus, there are risks such as not bringing your bathroom up to safety code and improper waterproofing.
Unless you can apply a full-time effort, it could stretch your master bathroom project out several months. A professional may only take a few weeks.
Materials
Do you desire custom marble from Italy or other imported fixtures? That can also create significant delays, thanks to delivery time, unexpected disruptions in the supply chain, or weather issues.
Frequently Asked Questions about Home Improvement
What Is the Most Expensive Part of a Bathroom Remodel?
When it’s time to remodel your bathroom, don’t be surprised if the biggest part of your bill comes from renovating your shower or tub area. This part is often more pricey due to the more complex plumbing, waterproofing, and use of more high-end materials.
Changing the layout creates additional work and expertise. Additional expenses in bathroom renovation come from custom cabinetry, reconfiguring plumbing when you move around fixtures, and doing additional electrical work. After all, electrical reconfiguration may be necessary for upgraded features like heated floors and different light fixtures.
What Adds the Most Value to a Bathroom?
If you want to add more value to your bathroom, consider replacing the tiles and flooring. Tile materials to consider include ceramic, porcelain, glass, natural stone, and cement. Heated floors have also become a major trend, especially in areas with harsh winters.
More homeowners are also installing new toilets due to frequent clogs and leaks, outdated functions, and eco-conscious and financial concerns about water use. Outdated toilets can use several gallons of water per flush, but an energy-efficient one may only use about 1 gallon per flush, according to the EPA.
Another popular value increasing upgrade includes upgrading vanities and countertops.
What Is the 30% Rule in Remodeling?
Experts advise creating a budgeting guideline, where you don’t spend more than 30% of your home’s current market value on any project. That way, you can ensure a good return on investment (ROI) and prevent overspending. Therefore, you should double-check what your home’s current overall value is during or before the planning and design phase.
Learn More About What to Expect When Remodeling a Bathroom
Now that you understand what goes into your bathroom remodel timeline, such as material, size, and preexisting damage, you can begin the process of upgrading this vital room. Just make sure you use the right professionals to handle the room you spend so much time in.
At The Kitchen & Bath Design Center, we can take your outdated Tampa Bay bathroom and convert it into a comfortable and luxurious piece. Our BBB A+ rated business has 25+ years of experience in replacing fixtures, adding jacuzzis, improving ventilation, re-routing electrical cables, and more. Contact our team for a consultation.